Cité Midtown – Phase 1 Condos
For Sale From:
Floor Plans & Pricing delivered to Your Inbox
Cité Midtown – Phase 1 Condos Price History
Floor Plans for Cité Midtown – Phase 1 Condos are coming soon.
Follow the project to get notified when floor plans & prices become available
Cité Midtown – Phase 1 Condos is a new condominium development by Urban Capital Property Group that is now complete located at 200 Boulevard Marcel-Laurin, Montréal in the neighbourhood with a 44/100 walk score and a /100 transit score. Cité Midtown – Phase 1 Condos is designed by NEUF architect(e)s and will feature interior design by NEUF architect(e)s. Development is scheduled to be completed in 2022. The project is 7 storeys tall and has a total of 210 suites.
Development team
- Developer
- Architect
- Interior Designer
Key Information
Townhouse (Ground Floor of Condo)
- Fitness Facility
- Heated Outdoor Pool
- Kid's Play Centre
- Work Stations
- Lockers Available
- Kitchenette
- Theatre Seating
- Cafe
- Dining Area
- Hobby Room
- Shared Work Space
- Outdoor Seating
- Dog Wash Stations
- Central Plaza
- Bar
- Underground Parking
- Lounges
- Pool Table
- Park
- Lobbies
- Concierge
- Package Room
- Private Boardroom
- Product Library
- Yoga Facility
- Mailroom
13 acre LEED ND (1) community consisting of four mid-rise buildings of 6 to 10 stories each, containing one- and two-storey condominiums and penthouses (Lot 1), and six blocks of townhouses and stacked townhouses (Lot 2)
Located just northwest of Autoroutes 15 and 40, with easy access to all points on the island
Located less than a 10 minute walk to the Du College Metro Station; an approximately 5 minute bike ride to the new Royalmount™, and a 10 minute drive to Montreal Trudeau
Clean modern architecture by NEUF Architect(e)s, with buildings clad in brick and metal panels
Underground parking on Lots 1 and 2, including visitor parking in Lot 2
A new concept “Shared Street” with traffic calming features to allow for safe use by pedestrians, bicycles and vehicles
Landscaped acoustic berm and fence for visual and acoustic separation from the train tracks to the east
Social Housing units to be constructed as part of Block 4
Condominium Building Features
Stylish lobbies, clad in black brick, warm woods and board-formed concrete (Phase 1), with seating area, concierge desk, and mail and package rooms
Executive concierge service (8)
Security features including Enterphones in the residential lobbies; an electric fob-based access system at all entry points and to the amenity areas; and strategically located security cameras
Phase 1 Condominiums
Approximately 210 high-design condominiums and penthouses with 9’0” high (Floors 2 and above) and 10’0” high (Ground Floor) exposed concrete or painted plaster ceilings9
Two elevators
Townhouse Features
Approximately 72 townhouses and stacked townhouses with 9’0” high painted drywall ceilings (9)
Engineered hardwood flooring (12) throughout
Suite entry doors with security viewers
Brushed aluminum contemporary hardware
Suite Features
Exposed concrete (10) or painted drywall ceilings
Exposed concrete columns and floor-to-ceiling sliding doors (11)
Engineered hardwood flooring (12) throughout
Suite entry doors with security viewers
Brushed aluminum contemporary hardware
Kitchens
Open concept kitchens with built-in pantries and / or islands (11)
Quartz countertops and tile backsplash (12)
Under-mount stainless steel sink, with single lever chrome faucet in Phase 1 and matte black faucet in Phase 2
Energy Star ® (11) appliances including fully-integrated 24” fridge and dishwasher, and stainless steel slide-in stove (some suites where noted have 30” stainless steel fridge)
Laundry
In-suite washer and dryer, either stacked or stand alone (11)
Bathrooms
Custom designed vanities with vessel sinks, quartz countertops (12) and contemporary single-lever faucets
Oversized mirror
Contemporary bathroom fixtures throughout, including dual flush toilets and water efficient faucets and showerheads
Square designed tubs and/or showers (11), with full height tile surrounds (12)
Frameless glass shower enclosures for separate showers (11)
Porcelain tile flooring and porcelain or ceramic tile for full height along vanity wall (12)
Temperature control valves in all showers
Heating & Cooling
Condominiums
Electric baseboard heating
Forced air central air conditioning with heat recovery ventilators (HRVs)
Centralized hot water system
Townhouses
Forced air heating and central air conditioning with heat recovery ventilators (HRVs)
In-suite hot water tanks
Electrical/Telecom
Pre-wired telephone and cable outlets, with outlets for high-speed internet access (13)
Service panel with breakers at suite entry
Switch controlled receptacles in living areas and bedrooms, light fixture(s) in foyer, track lighting in kitchen and rough-in for overhead fixture in dining room
Individual electrical metering
Additional Information
210 Suites
Floor Plans for Cité Midtown – Phase 1 Condos are coming soon.
Follow the project to get notified when floor plans & prices become available
- Launch Price/ft
- *****
- Current Price/ft
- $0 /ft
- Change from Launch
- *****