$1,071/sq.ft.

Before occupancy (2024)

$5,000 On Signing, Balance to 5% (30 Days) 5% (180 Days) 5% (450 Days) 5% (Occupancy)

Nordic Condos,

add
remove
Insights

Nearby Building Heights BETA

Clearance levels for surrounding buildings

add
remove

Nordic Condos Activity

All
Price change
New Floor Plan Added
Sales Status
May 12, 2024 9:18am
May 11, 2024 9:13am
May 11, 2024 8:58am
May 11, 2024 8:54am
May 11, 2024 8:54am Price Change
E14 (625sqft)
New Price: *****
May 11, 2024 8:54am Price Change
E1-G (578sqft)
New Price: *****
May 11, 2024 8:54am Price Change
B11 (498sqft)
Old Price: *****
New Price: ***** ***** *****
May 11, 2024 8:54am Price Change
G2 (724sqft)
Old Price: *****
New Price: ***** ***** *****
May 11, 2024 8:54am Price Change
E1-D (562sqft)
Old Price: *****
New Price: ***** ***** *****
May 11, 2024 8:54am
May 11, 2024 8:48am
May 11, 2024 8:48am Price Change
G5 (733sqft)
New Price: *****
May 11, 2024 8:48am Price Change
E1-H (570sqft)
New Price: *****
May 11, 2024 8:48am Price Change
E1-B (557sqft)
New Price: *****
May 11, 2024 8:48am Price Change
E1-A (557sqft)
New Price: *****
May 11, 2024 8:48am Price Change
B9-C (488sqft)
New Price: *****
May 11, 2024 8:48am Price Change
B5-A (443sqft)
New Price: *****
May 11, 2024 8:48am Price Change
B3-C (455sqft)
New Price: *****
May 11, 2024 8:40am
May 11, 2024 8:40am New Floor Plan Added
May 11, 2024 7:25am Sales Status changed to Selling
April 28, 2024 5:26am

Contact TalkCondo Agent

"*" indicates required fields

Activity

All
Price change
New Floor Plan Added
Sales Status
May 12, 2024 9:18am
May 11, 2024 9:13am
May 11, 2024 8:58am
May 11, 2024 8:54am
May 11, 2024 8:54am Price Change
E14 (625sqft)
New Price: *****
May 11, 2024 8:54am Price Change
E1-G (578sqft)
New Price: *****
May 11, 2024 8:54am Price Change
B11 (498sqft)
Old Price: *****
New Price: ***** ***** *****
May 11, 2024 8:54am Price Change
G2 (724sqft)
Old Price: *****
New Price: ***** ***** *****
May 11, 2024 8:54am Price Change
E1-D (562sqft)
Old Price: *****
New Price: ***** ***** *****
May 11, 2024 8:54am
May 11, 2024 8:48am
May 11, 2024 8:48am Price Change
G5 (733sqft)
New Price: *****
May 11, 2024 8:48am Price Change
E1-H (570sqft)
New Price: *****
May 11, 2024 8:48am Price Change
E1-B (557sqft)
New Price: *****
May 11, 2024 8:48am Price Change
E1-A (557sqft)
New Price: *****
May 11, 2024 8:48am Price Change
B9-C (488sqft)
New Price: *****
May 11, 2024 8:48am Price Change
B5-A (443sqft)
New Price: *****
May 11, 2024 8:48am Price Change
B3-C (455sqft)
New Price: *****
May 11, 2024 8:40am
May 11, 2024 8:40am New Floor Plan Added
May 11, 2024 7:25am Sales Status changed to Selling
April 28, 2024 5:26am

Key Information

Location
500 Wilson Avenue
,
Developer
Completion
2024
Sales Status
Selling
Development Status
Under Construction
Building Type
Condo
Price Range
$452,990 - $849,990
Suite Sizes
376 sq.ft to
925 sq.ft
Avg. Price (/ft)
$1,071
Parking Price
$45,000
Locker Price
-
Mt. Fees (/ft)
$0.56
Deposit Structure

(15% + 5%)

$5,000.00 On Signing

Balance to 5% - 30 days

5% - 180 days

5% - 450 days

5% - Occupancy

  • Outdoor Space
  • Lounge
  • Fitness Area
SUSTAINABLE FEATURES
When building communities, it is important to consider the long term impact of construction. Our construction guidelines are a starting point for sustainability and we constantly strive to exceed them. Below are just a few of the steps we take to ensure we create buildings that are lasting, energy-efficient and enhance the residents’ quality of life.

AIR QUALITY
Low-Emitting Vehicle (LEV) Spaces: Physical provision for future electric vehicle charging provided
Long-Term Bicycle Parking Location: 561 long-term secure spaces provided on P1
Short-Term Bicycle Parking Location: 62 spaces provided on the main level in a highly visible and publicly accessible location
Connectivity: Safe, accessible pedestrian routes that connect with off-site pedestrian networks and priority destinations
Sidewalk Space: 2.1m wide sidewalk to accommodate pedestrian flow.
Weather Protection Covered: outdoor waiting areas
Pedestrian Specific Lighting: Lighting provided to illuminate pedestrian walkways
Urban Heat Island Reduction: At Grade A combination of high albedo and shade provided through precast paving and trees
Green & Cool Roofs: Provided on available roof areas

GREENHOUSE GAS EMISSIONS AND ENERGY EFFICIENCY
Energy Efficiency: Building designed to achieve greater than 25% energy efficiency over the current Ontario Building Code
Building Commissioning: The project to be commissioned using best practices

WATER QUALITY, QUANTITY AND EFFICIENCY
Erosion & Sediment Control: Best management practices such as silt fencing, mud mats, and catch basin inlet protection have been added to reduce erosion and control sediment from runoff
Storm Water Balance: A cistern has been designed within the building footprint. The retained storm water will be used for irrigation of landscaped areas.
Total Suspended Solids (TSS): Removal of 80% of total suspended solids based on the post-development level of imperviousness
Drought-Tolerant Landscapes: Water efficient plant material provided for more than 50% of landscaped site area
Water Efficient Fixtures: Potable water consumption to be reduced by more than 30%, using efficient water fixtures and appliances
Irrigation Reduced: potable water used for irrigation by more than 50%

ECOLOGY
Tree Protection Tree: protection provided for all trees to be preserved
Street Tree Retention Protection: provided for street trees during construction.
Tree Planting: Tree canopy provided where available. Additional tree planting beyond the development site and the associated public boulevard
Soil Volumes Provided where available. Continuous tree trenches provided with a minimum of 20m³ per tree
Trees Along Street Frontages: Trees provided along street frontages
Watering Program: Watering program to be provided through drip irrigation for the first two years to ensure trees flourish
Biodiversity In Landscapes: All species to be native
Bird Friendly Glazing: First 12m treated with frit pattern and low-reflectance materials for at least 85% of glazing.
Rooftop Vegetation: Provided where glazing is above rooftop vegetation
Grate Porosity: All ground level grates to have porosity less than 20x20mm
Exterior Lighting: All exterior fixtures to be shielded, to reduce light pollution

SOLID WASTE
Waste Collection & Sorting Tri-sorting: provided for all buildings
Waste Storage Spaces: Easily accessible storage space provided
Bulky Waste: Additional space provided to dispose of bulky waste items

Additional Information

Walk Score
66 / 100
Transit Score
91 / 100
Architect
Interior Designer
Sales & Marketing Company
Count
12 Floors
429 Suites
Height (M)
-
Height (Ft)
-
Data last updated: September 15th, 2024